News

Heavy rain causes gravel to loosen on the Eastbourne railway line

HEAVY rain has forced a train operator to close one of its lines for a route safety inspection.

Gravel on the track near Glynde train station near Ringmer has become loose from the downpour.

Southern Rail has closed the line while Network Rail engineers survey the area and ensure it is safe.

A Southern spokesman said: “It has been reported that some ballast alongside the tracks near Glynde has been removed by heavy rain and some lines have been closed while Network Rail engineers conduct a safety inspection.

The Argus: ballast for railway linesBallast used on railway lines

“We are sorry that trains can be delayed by up to 30 minutes and the disruption is expected to continue until at least 5.30pm.

“Passengers whose journeys are delayed by 15 minutes or more can claim compensation for delay reimbursement.”

Follow our live blog for more updates.

https://www.theargus.co.uk/news/20668864.heavy-rain-causes-ballast-come-loose-eastbourne-railway-line/?ref=rss Heavy rain causes gravel to loosen on the Eastbourne railway line

Fry Electronics Team

Fry Electronics.com is an automatic aggregator of the all world’s media. In each content, the hyperlink to the primary source is specified. All trademarks belong to their rightful owners, all materials to their authors. If you are the owner of the content and do not want us to publish your materials, please contact us by email – admin@fry-electronics.com. The content will be deleted within 24 hours.

Related Articles

Back to top button